Submain Install - Dublin

Ongoing Project

One of our experienced cable installation crews are currently working on an apartment block in Dublin, pictures of which are to the right. 

Data Centre Project Dublin

Ongoing Project

Our electricians and apprentices are currently working on this project. Installing containment such as trunking, tray, ladder and basket. Cable pulling from size of 10mm - 250mm swa. Tying cleating and neatly dressing cables is something we take great pride in. LV termination and glanding also completed by H&G Contracts.

Power Station Project 

Ongoing Project

Our Electricians and skilled General operatives are working hard together to meet deadlines scheduled for this project. These qualified operatives are installing all steel containment systems, such as ladder, trunking, pipe, basket and tray. Also glanding and terminating all cables by our crews.

Our cable pulling teams are also pushing through deadlines, crews are pulling a range of cable from paired to single core cables such as 1 pair to 40 pair 25sq to 400sq cable. They are equipped with all relevant equipment for overhead and underground pulls.

Our cable pullers carry out a very high standard of cleating and cable tying in a format best suited for the cable type.

Completed Projects

We have previously worked on:

Lisahally 15.8 MWe +6.1 MWth Boiler based CHP Plant.

Widnes 20.2 MWe +MWth Boiler based CHP Plant.

Cramlington 27.7 MWe Biomass CHP Plant.

We have a vast amount of experience in large scale power plant and sub-station expertise. 

Currently worked on these projects for 5 years plus.

Our cable pulling team managed the LV and MV install to these projects, pulling control cables, right up to 500sqmm singles (EMC Cable).